בית / Customer / East Kirbest / Day 240 - 20160822 [6]
Images showing the ventilated ridge has been installed on the Studio and the Linkway.
Additional shuttering has been added to the doorways until the new door arrives and we can move the existing back door. Keeping the weather out and allowing the Linkway to start drying out after all the rain we had a few weeks ago.