Braehead Manse Gallery

Home / Customer / East Kirbest / Day 74 - 20160309 [5]

Another fab day weather wise, sees about 90% of the studio floor fully levelled and blinded, ready to mesh and pour concrete. Also images of cured lower link flooring, now waiting for some more blockwork and removal of step, before this is floored too.